Yesterday's
update was the big cooler re-installation. The arrow shows
how much wider the air guide has to be, to clear the big cooler.
This is the other
side. The tape fills the gap.

Now the gap is
filled with cabosil and one layer of matt.

When the matt is
cured, I will apply a cloth patch.

A little fine tuning.

Now I
have to open up the cooler tray and lower it approximately
13mm.

I'll apply
some lead weight and fill the gaps with epoxy cabosil and
cloth for strength.

These cups are
full of lead shot. The gaps have been filled. Tomorrow a little
bodywork and red primer.
<<<